Quick Reference
Menu map
| Group | Models |
|---|---|
| Estate & Dependencies | Site, Location, Asset, AssetDependency |
| Critical Controls | CriticalEvent, CriticalControl, ControlAsset |
| Verification | VerificationRequirement, VerificationActivity |
| Assurance & Exceptions | AssuranceException, CorrectiveAction, Evidence, Approval |
| Change & Conflicts | ChangeRequest, ChangeAsset, OperationalConflict |
The dashboard, read in ten seconds
- Operations cards — 26 critical controls, 22 effective, 7 open exceptions, 8 operational changes, 2 changes with conflicts, 33 infrastructure assets.
- Data Health lights — the alerts: 1 blocking operational conflict (red), 1 critical exception (red), 2 degraded controls, 1 failed control, 1 unverified control.
- The Blocking operational conflicts light links straight to the OperationalConflict list, whose top row is the flagship scenario.
The flagship scenario (DC-SCENARIO-001)
The demo is built around one intersection that a critical-infrastructure person recognises instantly:
- On the B power path at Northgate, UPS-B02 and its battery BAT-B02 are
DEGRADED— battery runtime is below the performance requirement. - That is exception EX-014 (control
NGDC-BATTERY_CAPACITY, severity HIGH, status ASSESSED) with an interim control: keep GEN-02 available; prohibit work that removes B-path standby generation until capacity is restored. - Change CHG-021 proposes to take standby generator GEN-02 UNAVAILABLE for a quarterly service.
- Because B-path battery capacity is already degraded, removing GEN-02 would
leave Data Hall 02 without required electrical redundancy → operational
conflict OC-001:
OPEN_CONTROL_EXCEPTION, CRITICAL, blocking, linking CHG-021 → GEN-02 → UPS-B02 → EX-014. - CHG-021 sits in
ENGINEERING_REVIEWwithredundancy_impact = COMPROMISED; approval is blocked.
To walk it live: Change & Conflicts → Operational Conflicts (top row), then follow the affected asset (GEN-02), the affected control (POWER_REDUNDANCY) and the referenced exception code (EX-014). Or start from the dashboard's red Blocking operational conflicts light.
Phase 1 note: this end-state is seeded. Creating CHG-021 in the app does not yet auto-raise OC-001 — that inference is Phase 2. Demo read-only mode keeps the seeded picture intact.
Demo data codes
| Code | Meaning |
|---|---|
NGDC / SWDC |
Sites: Northgate Data Campus (primary) / Southwater Edge (DR) |
POWER-A / POWER-B |
The two electrical redundancy paths at NGDC |
COOL-A / COOL-B |
The two cooling redundancy paths at NGDC |
UPS-B02, BAT-B02, GEN-02, BUS-B |
The B-path scenario assets |
EX-014 |
UPS-B02 battery runtime below requirement (the interim-control exception) |
EX-021 |
GEN-W1 failed autostart — the one CRITICAL exception |
CHG-021 |
Quarterly service GEN-02 — the flagship change |
OC-001 |
The blocking redundancy conflict |
Status vocabularies
- Asset.operational_status — AVAILABLE, RUNNING, STANDBY, DEGRADED, MAINTENANCE, BYPASSED, ISOLATED, FAILED, UNAVAILABLE, DECOMMISSIONED
- Asset.assurance_status — ASSURED, DEGRADED, FAILED, UNVERIFIED, NOT_APPLICABLE
- CriticalControl.current_status — EFFECTIVE, DEGRADED, FAILED, UNVERIFIED, SUSPENDED
- AssuranceException.status — OPEN, ASSESSED, ACCEPTED, ACTIONED, PENDING_VERIFICATION, CLOSED (open = anything but CLOSED)
- AssuranceException.severity — LOW, MEDIUM, HIGH, CRITICAL
- ChangeRequest.status — DRAFT, IMPACT_REVIEW, ENGINEERING_REVIEW, AWAITING_APPROVAL, APPROVED, SCHEDULED, EXECUTING, VERIFICATION, COMPLETED, REJECTED, CANCELLED
- ChangeRequest.redundancy_impact — NONE, REDUCED, COMPROMISED, UNKNOWN
- OperationalConflict.severity — INFO, WARNING, HIGH, CRITICAL; plus a
blockingflag and status OPEN / ACKNOWLEDGED / OVERRIDDEN / RESOLVED
Rules of thumb
- A control with no current verification activity reads as UNVERIFIED — that is a gap, not a pass.
- An exception with
interim_control_requiredmeans something must be true in the field right now (e.g. GEN-02 kept available) — that is what a change can violate. - A
blockingconflict is the one that should stop an approval. In Phase 2 it will; in Phase 1 it is recorded and surfaced.